COGCC Flowline Regulation Compliance
Supporting Form 44 flowline reporting required by new Colorado Oil and Gas Conservation Commission (COGCC) regulations. Post- and pre-construction data gathering and gap analysis. Collecting the best quality Geographic Information Systems (GIS) specifications, allowing for efficient submission, review, and management of flowline integrity data.
Urban Pipeline Installation
Hydrotested 350 miles of NGL pipeline, including installation of valves and meter stations, pipeline commissioning, and closeout. Installed eight (8) miles of pipeline through an urban area, with four (4) mainline valves, thirteen (13) regulator feeds, and five (5) jack and bore segments. Project was successful within expected metrics.